TL;DR
- Equipment approval is the question of who may commit the company to buying a laptop, and at what value.
- In most companies it is undefined, so each request finds its own route and the slow ones become the standard.
- The useful answer has two parts: a threshold below which nobody approves anything, and one named approver above it.
- Three models: everything approved, threshold-based, and fully delegated by budget.
- Choose based on how many requests you get per month, not on how much they cost.
- Done well, a standard laptop for a new starter needs no approval at all.
A hiring manager raises a request for a new starter's laptop on a Monday. It goes to their director, who is travelling. On Thursday it reaches finance, who ask which cost centre. On the following Tuesday it's approved. The machine then takes a week to arrive, so the new starter's first day involves borrowing somebody's old spare, and everybody describes this as a procurement problem.
It isn't. Procurement took a week. Approval took nine days, for a purchase that was always going to be approved, at a value nobody would have queried.
Best tools for HR Operations
The shapes vary. One company routes every device request through its CFO because that's what happened the first time and nobody revisited it. Another has no approval step at all and discovers at year end that seventy per cent of its hardware spend was on upgrades nobody compared. A third has a threshold so low that a standard laptop sits just above it, which means the threshold functions as no threshold at all.
The real issue isn't who signs. It's that approval exists to make a decision, and most equipment requests have no decision in them.
When You Don't Actually Need an Approval Step
Stage one: everything is standard and nobody approves anything. A new starter gets the standard build for their role. There's no choice being made, so there's nothing to approve, and adding a signature adds days without adding judgement. Most equipment spend in most companies is this.
Stage two: friction appears. Somebody asks for something different, or more expensive, or additional to what they already have. Now there is a decision, and somebody should make it. This is where an approval step earns its place.
Stage three: it becomes a liability. Either approval is everywhere, so every laptop takes two weeks and people route around the process entirely, or it's nowhere, so spend drifts upward with no visibility until the annual review.
Stage four: the edge case. Multi-country, multi-entity, with local purchasing in some markets and central in others, where approval authority and budget authority sit with different people in different places. That needs a real design rather than a rule.
What HR Teams Actually Need from an Approval Rule
> "Does a standard laptop need approving?" > No. Say so explicitly, because the absence of a stated answer means somebody will ask for one. > This single line removes most of the delay in the whole system.
> "What counts as standard?" > A named build per role, written down, reviewed twice a year. > Without that list there is no such thing as standard and every request becomes a judgement.
> "Who approves the non-standard ones?" > One named person, with one named deputy. > Two names, not a committee and not a chain, because every additional link adds a day and subtracts nothing.
> "What is the threshold?" > Comfortably above a standard build, not near it. > A threshold that catches ordinary purchases is not a threshold, it is a tax.
> "What happens when the approver is away?" > The deputy decides. Written down in advance. > This is the most common single cause of an approval taking nine days.
A sixth question surfaces in companies that have grown quickly. What about devices for people who already have one? That's usually the genuinely interesting category, and it deserves a different treatment from new starters rather than being pushed through the same form.
The Three Models and What Each One Costs
Everything approved. What it is: every device purchase needs a signature, regardless of value. When it's right: very small companies, where the approver is also the person who'd notice anyway, and the volume is a handful a year. When it fails: as soon as volume rises. At ten requests a month the approver is rubber-stamping, which means the control is theatre, and the days it costs are real.
Threshold-based. What it is: standard builds proceed without approval, anything above a stated value needs one named signature. When it's right: almost always, for almost everybody. When it fails: when the threshold is set too low, or when the standard-build list doesn't exist, so everything technically falls above the line.
Fully delegated by budget. What it is: each team has an equipment budget and spends it without per-item approval. When it's right: larger companies with real budget discipline and managers who understand their numbers. When it fails: on consistency and on the register. Delegated purchasing tends to produce a varied estate and local buying that never enters the central record, which is the expensive part and doesn't show up for a year.
Threshold-based is the right answer for most companies and the reason is simple: it puts the approval where the decision is. A new starter's standard laptop has no decision in it. A request for something specific and expensive does.
| Model | Speed for standard | Control over variation | Register quality | Works at |
|---|---|---|---|---|
| Everything approved | Slow | High in theory | Good | Under 30 people |
| Threshold-based | Immediate | Where it matters | Good | Almost any size |
| Fully delegated | Immediate | Low | Often poor | Larger, disciplined |
How to Choose: Five Questions
How many requests do you get a month? Under about three and almost any model works. Above ten a month, and anything requiring a signature per device is costing you real time in exchange for no judgement at all.
Do you have a standard build list? If not, build it first, because every other decision here depends on it. Without a definition of standard, a threshold has nothing to sit above and every single request becomes a judgement somebody has to make.
What does a standard build actually cost? Set the threshold at roughly twice that, so ordinary purchases clear it comfortably and genuinely unusual ones don't. A threshold sitting just above the standard price catches every rounding difference and currency fluctuation, which means it fires constantly and therefore means nothing.
Who notices if spend drifts? Somebody should be looking at the total monthly, which is a different control from per-item approval and a much better one. Monthly visibility catches drift; per-item signatures mostly catch nothing.
Who is the deputy? Name them now. The single biggest cause of slow approval is one person being unavailable with no documented alternative, and it happens several times a year.
Six Platforms Worth Knowing
RemoAsset Best for: making the spend visible so approval can be about exceptions rather than about everything. Why companies choose it: procurement and retrieval across 80+ countries with each device tracked against a person and a date, which matters for approval because the alternative to a per-item signature is accurate monthly visibility, and that needs a record somebody trusts. Published pricing from $1,499 a year on the Subscription tier for companies with 50 to 5,000+ employees, including a 60 per cent reduction on retrieval charges. It's our own product, so weigh that accordingly. Where it struggles: no network discovery, so a device bought locally outside the process stays invisible, which is precisely the failure mode a fully delegated model creates. No software licence management, which is often the larger approval question and sits elsewhere. And only the Subscription tier publishes a figure, with pay-as-you-go quoted.
Electric AI Best for: smaller companies wanting IT management and device oversight in one place. Why companies choose it: it publishes real prices, which almost nobody in this category does: $10 per user per month on Essentials and $25 on Pro, with a free tier available. Where it struggles: per-user pricing means the cost scales with headcount rather than with devices, and it's an IT management product rather than a logistics one.
Workwize Best for: companies where approval delay is really a stock problem. Why companies choose it: own warehouses, so standard builds can be held ready. Where it struggles: publishes no rate card. The figures on its pricing page are savings claims rather than prices. Live domain is goworkwize.com.
Firstbase Best for: standardised builds ordered repeatedly with minimal process. Why companies choose it: clean subscription model, strong supply side. Where it struggles: publishes nothing on price, and retrieval is the weaker half.
allwhere Best for: handing procurement over entirely, which changes the approval question into a budget one. Why companies choose it: managed service, low internal lift. Where it struggles: publishes nothing, so comparison requires a conversation.
Deel IT Best for: companies already running employment through Deel who want one approval route for both. Why companies choose it: hardware alongside employment, MDM and support included. Where it struggles: publishes no price for IT, and its own page states both 130+ and 150+ countries without reconciling them.
The Decision Table: What Actually Needs Deciding
| Situation | Scale | Setup | Primary Pain | Recommended Starting Point |
|---|---|---|---|---|
| Under 5 requests a month | Under 50 | Single market | Little | Standard build, no approval |
| 10 or more a month | 50-500 | Any | Approval delay | Threshold with one named approver |
| No standard build defined | Any | Any | Everything is an exception | Define the builds first |
| Spend drifting upward | Any | Any | No visibility | Monthly total, not per-item signing |
| Several entities and markets | 200+ | Multi-market | Authority mismatch | Map authority per entity |
| Upgrade requests rising | Any | Any | No rule for second devices | Separate rule for existing holders |
Rows two and three cover most of what actually goes wrong.
Define the Standard Build Before Anything Else
Every other recommendation on this page depends on this one, and it's the step most often skipped because it feels like documentation rather than a decision.
A standard build is a named specification per role. Not a price range, not a preferred supplier, a specific thing: this model, this configuration, these accessories, for people doing this kind of work. Three or four builds covers most companies. Engineering gets one, design gets one, everybody else gets one, and there's a fourth for whatever your unusual function is.
What this does is convert most requests from decisions into transactions. A new starter in sales gets the sales build. Nobody chooses, nobody approves and nobody discusses it, which means the request can be raised and fulfilled inside the same hour.
It also gives you a defensible answer when a request arrives asking for something different. A reference point. Without a standard, every such request is a negotiation with no reference point, and the outcome depends on who's asking and how insistently. With one, the conversation is specific: here's the standard, here's what you've asked for, here's the difference, and here's who decides.
Two mechanics worth getting right. Review the builds twice a year rather than annually, because hardware moves and a stale standard produces a growing stream of exception requests. And include the accessories in the definition, because the monitor, dock, keyboard and chair are where unmanaged spend actually accumulates, and they're the items nobody thinks to specify.
The list should live somewhere people can see it before they ask. Half the exception requests a company receives are from people who had no idea what they were entitled to and asked for what their last employer gave them.
Set the Threshold High, Not Low
The instinct is to set the approval threshold just above the standard build so that anything unusual gets caught. That produces a control that fires constantly and therefore means nothing.
Standard builds vary in price. Currency moves. A supplier changes a configuration and the price shifts by eight per cent. Accessories get added for one person and not another. If your threshold sits a little above the standard cost, all of that noise lands on the approver's desk as a request to sign, and they'll approve all of it because it's all ordinary.
Set it at roughly twice the standard build instead. Everything ordinary clears comfortably. What lands on the approver's desk is genuinely unusual: a specialised workstation, a high-specification machine for a particular task, a bulk order. Perhaps two or three a month, each with an actual decision in it, each getting real attention.
The objection is that this allows meaningful spend without approval, and it does. The answer is simple. Per-item approval was never what controlled that spend. A monthly total, reviewed by somebody who knows what to expect, catches drift far more reliably than a signature on each request, because the signature is given in isolation and the total is seen in context.
One refinement worth adding. Anything that isn't a new starter should be treated differently regardless of value, because that's where the interesting requests are. A replacement for a failed machine is routine. An additional device for somebody who already has one, or an upgrade for a machine that still works, has a decision in it even when the price is ordinary.
Name One Approver and One Deputy
Not a committee and not a chain. One person who decides, and one person who decides when they can't.
Chains are the main cause of slow approval. Usually by accident. A request goes to a manager, who forwards it to a director, who sends it to finance, because each link isn't sure whether they have authority. Nobody designed that; it assembled itself from uncertainty, and each additional hop adds a day or two while adding no scrutiny, because the second and third approvers are just confirming that the first one approved it.
So state who it is. Ideally somebody who understands equipment rather than purely finance, because the useful questions here are about what the person actually needs rather than whether the money exists. In many companies the right person is whoever owns IT or people operations rather than a finance approver.
Then name the deputy. That is the part that actually determines the average approval time. An approver on leave for two weeks with no documented alternative turns a one-day process into a fifteen-day one, and it happens several times a year. Write the deputy's name in the same sentence as the approver's.
And set an expectation on timing. Two working days to a decision is reasonable, and stating it means a request that sits for a week is visibly late rather than ambiguously in progress. Without a stated expectation nobody can tell the difference between slow and pending.
One detail is worth copying from companies that get this right. No meetings. Approval questions should be answerable in writing, which means that if the approver needs more information they ask one question and get one answer back the same day. Scheduling a conversation to decide on a laptop costs more than the laptop.
What to Do About Local Purchasing
Worth its own section because it's the failure mode of delegated models and it costs more than any approval delay.
In companies operating across several markets, some hardware gets bought locally. Inevitably. Somebody needs a machine in a country where shipping takes three weeks, so they buy one from a local retailer and claim it on expenses. It's the sensible thing to do and it's how devices end up outside every system you have.
The device then has no serial number in your register, no enrolment in your management platform, no warranty record anybody can find, and no clear owner at the point the person leaves. It's invisible, and because it was bought on expenses rather than through procurement, the spend is invisible too.
Two fixes, and they work together. The first is to make the central route fast enough in that market that local buying stops being the sensible option, which is a logistics question rather than an approval one. The second is to accept that local purchasing will happen sometimes and build a path for it: a short form capturing serial, model, date and holder, with the expense claim requiring it.
What doesn't work is forbidding it. People will still need machines, and a prohibition just moves the purchase somewhere less visible.
Where Jurisdiction Comes In
Two things here are not approval questions.
Who has authority to commit a company to spending, what that authority depends on and how it works across entities differ by jurisdiction and by corporate structure. An approval rule sitting on top of that is an internal process rather than a statement about authority, and the underlying question needs proper advice in each market.
The second is anything raised on health or accessibility grounds. Those requests should not go through an equipment approval route at all, regardless of value, and that should be stated plainly so people know where to take them.
What's portable is the rest. Define standard builds. Set the threshold high. Name one approver and one deputy. Review the monthly total rather than signing each item. Build a path for local purchasing instead of forbidding it. None of that needs legal advice, and all of it determines whether a new starter's laptop arrives before their first day or after it.
What the Monthly Review Actually Looks At
The page argues that monthly visibility beats per-item approval. That only holds if the monthly review is a real review, and in most companies it's a number in a pack that nobody interrogates.
Four figures make it useful, and they take about twenty minutes to assemble once the first one is set up.
| Figure | What it catches | What it does not |
|---|---|---|
| Total against last year and the 3-month average | A trend | A single lumpy month |
| Average cost per device | Specification drift | Volume growth |
| Share outside the standard builds | A stale build list | Individual exceptions |
| Local purchases on expenses | A slow central route | Anything bought centrally |
The second row is the one I'd watch hardest. I've seen average device cost rise 31 per cent over 18 months in a company where every individual purchase had been approved by somebody, which is exactly the drift a per-item signature cannot see.
Total spend for the month. Against the same month last year, and against the rolling three-month average. The comparison matters more than the absolute, because equipment spend is lumpy and a single month means little. What you're looking for is a trend, and three months of rising average is a signal that one month of high spend is not.
Device count and average cost per device. This is the figure that catches the drift per-item approval misses entirely. Spend rising because you hired more people is fine. Spend rising because the average machine now costs thirty per cent more than it did eighteen months ago is a decision nobody made, assembled from individually reasonable choices.
Spend outside the standard builds, as a proportion. If exceptions are five per cent of purchases, the standard build list is doing its job. If they're forty per cent, the list is stale and needs reviewing, which is a far more useful finding than any individual approval.
And local purchases on expenses, separately. This is the number that tells you whether the central route is fast enough. Rising local buying means people are routing around the process, which is a logistics problem presenting itself as a compliance one.
Who looks at it matters as much as what's in it. Possibly more. The useful reviewer is somebody who knows roughly what to expect, which usually means whoever owns the equipment operation rather than a finance analyst seeing it for the first time. A reviewer with no prior expectation can only confirm that the arithmetic adds up.
And the review needs somewhere for a finding to go. Noticing that average device cost has risen is only valuable if there's a route to doing something about it, which is usually a standard build review rather than a tightening of approvals.
Reviewing the Standard Build List Without Restarting the Argument
The page says review the builds twice a year. That review is where the whole system either stays current or quietly decays, so it's worth describing how to run it in a way that takes an hour rather than becoming a project.
Start from the exception requests, not from the catalogue. Whatever people asked for that wasn't standard, over the last six months, is the actual data about where the list is wrong. If four people asked for more memory, the build needs more memory. If one person asked for something unusual, that was correctly an exception.
Then check the supply side. Models get discontinued, configurations change, and a build list naming a machine that's no longer available produces an exception request for every single hire until somebody notices. This is the most common cause of a list going stale and the easiest to fix.
Then the price. Standard build costs move, and the approval threshold was set relative to them. If the build cost has risen twenty per cent and the threshold hasn't, the threshold is now closer to the standard price than you intended, and ordinary purchases are starting to clear it.
What to resist is re-opening the question of what people should have. The build list is a set of decisions already made, and a review that treats every line as open invites a general debate about entitlement that consumes an afternoon and changes little. The review is maintenance, not policy.
One addition worth making each time: look at what you can remove. Build lists accumulate items. A docking station specified three years ago for a port configuration that no longer exists, a particular cable, an accessory nobody uses. Each one is small and the aggregate is real, and nobody ever takes anything off a list unless it's a deliberate step in the review.
Publish the result where people can see it before they ask, which is the step that reduces exception requests more than any change to the builds themselves.
Where it lives matters more than the format. A build list sitting in a document somebody has to request is not published, and half the exception requests a company receives come from people who had no idea what they were entitled to and asked for whatever their last employer gave them. Put it wherever your people already look for policies, and link it from the hiring manager's checklist so that it is in front of whoever is about to ask.
The Second Device Problem
The page notes that requests from people who already have equipment deserve different treatment. It's worth more than a note, because this is the category where unmanaged spend actually accumulates and almost no approval rule addresses it.
New starters are self-limiting: you hire a person, they need a machine, the volume is bounded by recruitment. Requests from existing staff have no natural ceiling, and they arrive one at a time, each with a reasonable case.
Four shapes, and they need different answers.
A genuine replacement, where the machine has failed or is at end of life. Routine, should need no approval at all, and should be checked against the register rather than the request, because the age is a fact rather than an opinion.
An additional device, where somebody wants a second machine alongside their first. Rarer than it sounds. Occasionally correct, as discussed elsewhere for people who travel constantly or whose work stops entirely on a failure. Usually worth a conversation about what problem it solves, because the answer is sometimes a specification change rather than a second machine.
An early upgrade, where the machine works but is slow for the work being done. The hardest of the four. The most legitimate-sounding and the hardest to assess, because the person is usually right that it's slow and the question is whether it's slow enough to replace two years early. This is where a named approver who understands the work is worth more than a finance threshold.
And an accessory accumulation. Somebody requests a monitor, then a second monitor, then a different keyboard, then a chair. Each one small, none worth an approval, and the total meaningful. The fix is a per-person peripheral budget rather than per-item approval, which converts a series of unreviewable small requests into one visible allocation.
Route all four to the approver regardless of value, and route new starters straight through. That single asymmetry puts the attention where the decisions are, which is the whole argument of this page applied to the category most people forget.
That asymmetry is the one rule worth writing down if you write down nothing else. New starters go straight through, and everybody else goes to the approver.
Who Should Not Be the Approver
The page says name one person who understands equipment. It is worth being explicit about the common choices that do not work, because the appointment is usually made by default rather than deliberately.
The CFO or finance director. Often where it lands because the first request happened to go there, and it is the wrong seat for two reasons. The useful question about an equipment request is whether the person needs the thing, which is an operational judgement rather than a financial one. And a senior finance approver is the hardest person to reach, which turns a two-day decision into a two-week one.
The requester's manager. Sounds sensible and produces inconsistency, because every manager applies a different standard and nobody sees the pattern. It also puts managers in the position of adjudicating their own team's requests, which they will approve, so the control does nothing while adding a step.
A committee. Whatever it is called, a group that meets to decide on equipment is a group that meets fortnightly, which sets your floor approval time at a fortnight. Nothing in this category needs a committee.
Whoever is available. The silent default in most companies, and the reason approval outcomes vary by who was in the office. It also means no single person builds the judgement that makes approval useful, because nobody sees enough requests to develop a sense of what is normal.
The person who works is usually whoever owns the equipment operation: often an IT lead, sometimes a people operations manager. They see every request, so they know what normal looks like. They understand what the person is asking for. And they are reachable within a day, which is the single property that most determines how long an approval actually takes.
If that person reports into finance for budget purposes, the arrangement still works. Budget authority and approval authority do not have to sit with the same person, and separating them is usually better.
One thing the approver needs is easy to forget. Visibility of what has already been approved. Somebody deciding on a request in isolation, with no view of the five similar ones that came through last month, cannot spot a pattern and cannot apply a consistent standard. A short monthly list of what they approved and what they declined, sent back to them, is enough, and it is what turns an approver into somebody with judgement rather than somebody with a signature.
The Cost of Getting This Wrong
The visible cost of bad approval is time. And it's larger than people expect. Nine days of approval on a one-week procurement means the lead time people complain about is two-thirds administrative. Across fifty hires a year that adds up to a great many first days spent on somebody else's borrowed machine.
The second cost is that people route around it. Any process slow enough to prevent somebody doing their job gets bypassed, and in this case the bypass is local purchasing on expenses. So an over-tight approval rule produces exactly the invisible spend it was designed to prevent, which is a fairly complete self-defeat.
The third is the opposite failure. No approval at all, no standard builds, and spend drifting upward one request at a time, which nobody notices because each individual purchase looked reasonable. Then the annual review finds that the average device cost has risen forty per cent in two years and nobody can say which decisions caused it.
And the fourth is the register, which is the one that lasts. Devices bought outside the process don't get recorded, and a register with unknown gaps is a register you can't plan refreshes from, can't audit, and can't rely on when somebody leaves.
So the question worth asking isn't who should sign. It's how many of your equipment requests contain an actual decision.
When You're Ready to Move Beyond Ad Hoc Routing
The signal is somebody asking who needs to approve a laptop, because the fact they're asking means the answer isn't written down.
What replaces it fits on one page. Three or four named standard builds with their accessories. Those need no approval at all. A threshold at about twice a standard build, above which one named person decides, with one named deputy, within two working days. Anything that isn't a new starter gets looked at regardless of value. A monthly total reviewed by somebody who knows what to expect. And a short form for the local purchases that will happen anyway.
That's six items, it takes an afternoon to agree, and it removes most of the lead time people currently attribute to procurement.
RemoAsset is our own product, so weigh this accordingly. The relevant part is that replacing per-item approval with monthly visibility only works if the record is accurate, which means devices need to be captured at the point of issue rather than reconstructed later. It has no network discovery, so the locally bought machines stay invisible until somebody records them manually, and no software licence management, which is frequently the bigger approval question.
If a standard laptop for a new starter currently needs a signature at your company, that's the thing to change this week.
Frequently Asked Questions
Should a standard laptop for a new starter need approval?
No, and stating that explicitly removes most of the delay in the whole system. There's no decision in it: the person is hired, the role has a standard build, and the approver is going to say yes. A signature there adds days without adding judgement. Reserve approval for requests that contain an actual choice, which are the non-standard and the non-new-starter ones.
Where should the approval threshold sit?
At roughly twice the cost of a standard build. Not just above it. A threshold near the standard price catches currency movement, configuration changes and added accessories, so the approver sees a constant stream of ordinary requests and approves all of them, which makes the control meaningless. Set it high and what reaches the approver is genuinely unusual and gets real attention.
Who should be the approver?
One named person with one named deputy. Never a committee or a chain. Ideally somebody who understands equipment rather than purely finance, because the useful questions are about what the person needs. The deputy matters more than people expect: an approver on leave with no documented alternative is the single most common cause of a one-day process taking two weeks.
What is a standard build and why does it matter so much?
A named specification per role, including accessories: this model, this configuration, these peripherals, for people doing this kind of work. Three or four covers most companies. It matters because every other rule depends on it. Without a definition of standard, a threshold has nothing to sit above and every request becomes a negotiation whose outcome depends on who asked and how insistently.
How do we control spend without approving each item?
Review the monthly total. That is a better control than per-item signatures. A signature is given in isolation and tells you only that one purchase looked reasonable. A monthly total seen by somebody who knows what to expect catches drift, because drift is a pattern rather than an event. Per-item approval mostly catches nothing while costing days on every request.
What should we do about devices bought locally on expenses?
Build a path for it rather than forbidding it. People in markets with long shipping times will buy locally because it's the sensible thing to do, and a prohibition just moves the purchase somewhere less visible. Require a short form with serial, model, date and holder as a condition of the expense claim, and separately make the central route fast enough in that market that local buying stops being necessary.
Should upgrade requests be treated differently from new starters?
Yes, and regardless of value. A replacement for a failed machine is routine. An additional device for somebody who already has one, or an upgrade for a machine that still works, has a real decision in it even at an ordinary price. That's where the interesting requests sit, so route them to the approver whether or not they clear the threshold, and route new starters straight through.
How quickly should an approval decision come back?
Two working days is reasonable. And stating it is what makes the difference. Without a published expectation, nobody can distinguish a request that's late from one that's pending, so slow approvals are invisible. Also require that the decision be made in writing without a meeting: if more information is needed, one question and one answer, because scheduling a conversation about a laptop costs more than the laptop.
Put the approval where the decision is, and let everything else through.